2003
- Present |
: |
- Total Balikpapan East Kalimantan
Operation. Cathodic protection for onshore process area, oil
wells, offshore platforms, subsea pipelines and onshore pipelines.
|
- Petronas Carigali Myanmar Ltd.
Cathodic protection for buried pipelines. Trouble shooting,
design and mitigations.
|
- Bedero Shaw. Third party inspection
for bracelet anodes for E-11 subsea pipeline.
|
- Institute of Materials, Malaysia.
Cathodic protection training course for Petronas Training Center,
Bangi.
|
- Admiral Cove Marina, Port Dickson.
Installation and commissioning of sacrificial anode system.
|
- Admiral Cove Marina, Port Dickson.
Coating touch-up for sheet piles.
|
- Star Shine Marketing Sdn. Bhd.
(Yong Kong Galvanizing). Corrosion failure analysis of galvanized
steel channel.
|
- Pahlawan Power, Melaka. Inspection,
rectification, re-commissioning of impressed current system.
|
- Pahlawan Power, Melaka. Engineering
consultancy for installation of new submarine 90 mm diameter
HDPE pipeline for electrochlorination anti fouling system.
|
- Aquaria KLCC Convention Center.
Design, install, testing and commissioning of steel rebar electrochemical
potential monitoring system for steel reinforced concrete columns.
Incorporation of online monitoring system.
|
- Genting Sanyen. Corrosion rates
testing by Linear Polarization Resistance Measurement method
for two selected solutions and two metal samples.
|
- Petronas Gas – MPE Lindung.
Improvement of impressed current cathodic protection system
for buried pipings at Kemaman Export Terminal.
|
- Total Indonesie – PT Kartini
Utama. Engineering design endorsement for Tambora Field Development
Project, Phase 2 – EPSC 2.
|
| |
|
- CTOC – inspection and analysis of
duplex stainless steel spools for fitness to use.
|
| |
|
- Johor Port Berhad – inspection, monitoring,
and failure analysis of cathodic protection system for Berth 1,
2 & 3.
|
| |
|
- Petronas Gas – MPE Lindung. Close
Interval Potential Survey (CIPS) for CP System for NPS30 PGU2
SEC.3 (ML005, Kluang to Plentong M/S) and Straits of Johore Pipeline.
|
| |
|
- TNB – RNC Technology. To Revamp,
Refurbish, Test and Commissioning Cathodic Protection System for
Unit 1 (CW Intake) and Unit 2 (CW Pump House) of Phase 1Conventional
Steam Plant at Stesen Janaelektrik Sultan Iskandar, Pasir Gudang,
Johor.
|